Haim Pick 6, Jerusalem
Under construction
About the project
A Pinui Binui project located near the largest project in Jerusalem.
The building is located on the seam line between the entrance to the city, the central bus station, and the central neighborhoods in Jerusalem.
This project is intended for demolition and reconstruction, as well as an addition of 25 square meters per apartment.
The internal and external design is done by the best professionals in the market, while paying attention to the highest standards.
At the end of the project, the buyers will enjoy spacious and luxurious apartments in a prestigious building with the most impressive exterior and the most central location in Jerusalem.
building the future of jerusalem
02-5858-409
Specifications
project catalog
Programs and simulations
Technical Specifications
All apartments have been designed to provide residents with the highest standard of living. The apartments offer luxurious planning options and a host of extras.
General Building:
• A luxurious main entrance lobby designed in architecturally , including granite flooring and granite walling.
• A quality elevator from a leading manufacturer, with an option to operate as a Shabbat elevator.
• Jerusalem stone on the external cladding.
• Perfect environmental development.
• House protected spaces, including a filter by device in each apartment.
• Unique architectural design as per customer requirement.
• Under floor heating.
• 80*80 cm porcelain flooring, with a wide choice of designs.
Bathrooms:
• Monobloc, suspended toilets with a concealed washing mechanism.
• Ceramic wall cladding in a variety of sizes and shades.
• Bathroom cabinet including integral sink and mirror.
• Decor in shower and bath rooms – a few models to choose from.
• Acrylic bath.
• Preparation for heating.
• Anti-slip flooring 33 / 33 cm tiling.
• Busy / free lock.
• Water heating – electric heater + thermosolar system (solar water heater)
• Designed faucets.
Kitchen:
• Luxurious kitchen.
• Kitchen cabinets Upper and Lower cabinets made from laminated ply wood boards, including a standing unit for an oven and a built-in oven.
• Preparation for a dishwasher close to the sink.
• Flat-mounted acrylic sinks.
• Caesar stone work surface in a variety of shades.
• Quiet drawers.
• Designed faucets with a flexible tap-end.
• Integrated handles.
Electrical power:
• Three phase electric power * 3 * 25 amperes.
• Preparation for a heating stove in the bathroom and shower.
• Intercom at the entrance to the apartment.
• Preparation for air conditioning.
• Service outlets) water protected) in the kitchen and in bathrooms.
Sun terraces:
• Wide balconies
• Sukkah balconies from the living room
• Garden faucets on balconies
Doors:
• Designed steel door
• Quality interior doors filled with a variety of flexboards, including designed handles.
Windows and Aluminum:
• High quality aluminum and glass windows.
Double glazed windows except in the safe room and bathrooms / toilets.
• Preparation for shutters in the security room, and preparation for netting in all windows.
• Electric roller shutter in living room.
• Aluminum roller shutters in bedrooms.
• Especially wide window openings.
Programs and simulations
building the future of jerusalem
02-5858-409
Project progress
measurements
full plans
city engineer
Traffic
Opinion of planning department
City engineer
Building fees
Publicizing application
Referral to council
Council’s decision
Ministry of Industry, Trade and Labor approval to bury gas tank.
Detailed model in city model / exemption from city model.
Approval of the Department of Hapa (Gardening).
Approval of the Sanitation Division..
Approval of the Environmental Protection Unit. (Agreement with landfill site)
Issuance of payment voucher Department of betterment levy.
Issuing payment voucher Department of paving charges.
Issuing payment voucher Gihon company.
Issuing payment voucher IEC
Authorized access / accessibility exemption.
Approval of the Road Department.
Home Front Command approval.
Authorization of the Israel Antiquities Authority.
Approval of firefighting services
Contract with a laboratory approved for testing concrete, stone, gaskets, gas, and plumbing.
Registration of a cautionary note at the Land Registry Bureau.
Forms and declarations
Submission of 3 final plans – drawn, signed and amended.
Payment of construction fee.
Payment to the Gihon company
Payment of betterment tax
Payment of paving fees